混凝土机械的养护是分季节性的!
For the maintenance of automatic concrete mixer in winter, many equipment need to be maintained. There are still seasons for the maintenance of some large mechanical engineering equipment. The maintenance in summer is different from that in winter. How to maintain the automatic concrete mixer in winter and how to operate safely and normally in the severe cold season.
1、因为季节的关系,在混凝土搅拌站运行之后,操作人员在基尼系那个的工作之后是需要对设备的搅拌罐壁内外积灰、卸料口处、搅拌轴及卸料门上的上残留物进行清 除工作的,可以使用水将设备的这些地房进行冲洗,如果有需要的话是可以放进去少量的石子和水搅拌在十分钟之后放出来。用水清洗车、附加剂箱及其供系统。这些都是每天运行玩之后需要做的。
1. Due to the season, after the concrete mixing plant is operated, the operators need to remove the ash inside and outside the mixing tank wall, the residue on the discharge port, the mixing shaft and the discharge door of the equipment after working in Gini department that day. These floors of the equipment can be washed with water, If necessary, you can put in a small amount of stones and water, stir and release it after ten minutes. Clean the car wash, additive tank and its supply system with water. These are what you need to do after running and playing every day.
2、在冬季好需要将设备的运行结束之后是需要放尽水泵、附加剂泵、水箱、附加剂箱的里面的水和残留物,这样在严寒的季节对设损坏泵及其管路,还需要启动水泵的附加剂泵运转一分钟左右,这都是冬季混凝土搅拌站的保养之道。
2. In winter, after the operation of the equipment is completed, it is necessary to drain the water and residues in the water pump, additive pump, water tank and additive tank. In this way, in the severe cold season, if the pump and its pipeline are damaged, it is also necessary to start the additive pump of the water pump to operate for about one minute, which is the maintenance way of the concrete mixing plant in winter.
3、混凝土自动搅拌车在冬天要是不使用的话其每台仪器施工设备需要每周必 须开机两次,并且每次开机时间需要半个小时。这样防止冬季混凝土搅拌站长期不使用而造成冻伤,或者会开机启动不了的现象。
3. If the automatic concrete mixer is not used in winter, each instrument and construction equipment must be started twice a week, and each start-up time takes half an hour. This will prevent frostbite caused by long-term non use of concrete mixing plant in winter, or failure to start up.